T.J. Zitman
8 records found
1
The tidal channels in the Eastern Scheldt basin, are out of equilibrium due to the reduced tidal prism as a consequence of the construction of the Storm Surge Barrier in 1986. An estimated 500 million cubic meters of sediment is required in order to reduce the cross-sectional ar
...
Tidal control in the Lower Ems
An indicative study into the effects of controlled barrier operation on the tidal asymmetry in the Lower Ems river
The lower Ems river suffers from hyper-turbid conditions. These conditions are caused by channel deepening over the last 50 years, resulting in an asymmetrical tidal wave. This asymmetry has resulted in an increased
import of sediment into the Ems river. Recently some effort ...
import of sediment into the Ems river. Recently some effort ...
Nuevo Ferroviario Rio Biobío
Hydraulic and structural study for the new railway bridge to investigate the influence of river morphodynamics and tsunami impact on the structural stability of the bridge pier
In Chile, the Biobío river separates the cities of Concepción and San Pedro de la Paz. Bridges crossing the Biobío river ensure a fast and dependable connection, which contributes to the transport options in the region. With the Biobío region being the second largest contributor
...
Polder system Can Tho City
Impact of the urban polder on Can Tho City
Vietnam is one of the five countries that is severely affected by the consequences of climate change. The extreme weather conditions and the increase of the sea level results in floods in the Mekong Delta, located in the South of Vietnam. Can Tho city, found in the heart of the M
...
Financial risks assessment of the breakwater construction phase
Feasebility study of a probabilistic process-based simulation model
During construction of breakwaters, adverse weather conditions can result in damage, in the form of reshaping and loss of material to the open work fronts of the structure. Based on literature research, analysis of work methods, analysis of damage to older breakwater projects and
...
Immersed tunnel elements are prefabricated in the construction yard and then transported to the construction site to be integrated into the tunnel. During the transportation and immersion, the floating tunnel element is connected via cables to the immersion barges/pontoons. In th
...
Een schutsluis maakt het mogelijk om schepen van het ene naar het andere waterpeil te brengen. Van belang is hierbij dat de krachten op de schepen in de sluis niet te hoog worden. Het vullen en ledigen van een schutsluis gaat gepaard met golf- en stromingsverschijnselen die krach
...
The main goal of this study is to determine the relation between very oblique wave attack and overtopping, and to accordingly adjust the formulae for oblique wave attack. The required knowledge to be able to read and understand this report is of a Bachelor in civil engineering le
...