We’re experiencing a temporary delay in fetching the latest content.
Search in the TU Delft Repository Collections
TU Delft Repository
TU Delft Repository contains Academic TUD Outputs and Digital Assets within the Research and Education Domains. The repository serves as a platform for the diverse TU Delft scholarly Outputs, adhering toOpen Access principles and promoting accessibility, transparency, andS collaboration in academic research.
The repository offers a public interface with a focus on quality and societal relevance and impact, notably by offering moderated keywords and curated themes. Content from the Heritage Domain is being evaluated to be added by 2025. Prior content in the Heritage collection has been archived. A Business Domain showcasing content by faculty is coming by 2025.
The purpose of the TUD Next Generation Repository is to provide a sustainable, stable, central location for files and metadata and to provide access to these files and metadata to both people and machines.
Recently Added Records
Influence of Hammer Design on Pile Driving Noise
The Sound of Impact
A transient, axisymmetric finite element model coupled the deformable ram and anvil of an IHC S-4000 hammer to the pile and the water. The pile-head force therefore followed from contact. The model was verified and benchmarked against GRLWEAP and scaling laws, but not validated against measurements. The results are relative comparisons of single blows for one pile. Thirty variations of the ram, the anvil and their coupling, including simplified models of the MENCK Noise Reduction Unit (MNRU) and IQIP's PULSE, were compared at equal impact energy. Each variation was evaluated by its hammer efficiency, the fraction of the pile energy that entered the water and the depth-averaged sound exposure level (SEL) at 10 m from the pile axis. These quantities show whether a variation changes the noise through the energy delivered to the pile or through the fraction entering the water.
Doubling the ram length lowered the SEL by 4.9 dB at almost unchanged hammer efficiency. Shifting cross-sectional area from the impact end to the top of the ram lowered the SEL by 5.0 dB, although more energy entered the pile. The fraction of that energy that entered the water decreased by almost a factor of four. The doubled-length ram achieved a similar reduction to the MNRU model, without its loss of hammer efficiency but with twice the ram mass. The PULSE model gave a larger reduction, whose size depends on an uncalibrated chamber stiffness. Differences in underwater sound exposure were largely explained by the pile-head force spectrum. A more gradual force puts less of its spectrum where the pile radiates most strongly. The hammer design therefore changes the noise mainly through how gradually the pile-head force develops. The noise of a design is thus better assessed from its force spectrum than from its hammer efficiency. Future work should measure the differences between configurations and compare them at equal penetration per blow. ...
A transient, axisymmetric finite element model coupled the deformable ram and anvil of an IHC S-4000 hammer to the pile and the water. The pile-head force therefore followed from contact. The model was verified and benchmarked against GRLWEAP and scaling laws, but not validated against measurements. The results are relative comparisons of single blows for one pile. Thirty variations of the ram, the anvil and their coupling, including simplified models of the MENCK Noise Reduction Unit (MNRU) and IQIP's PULSE, were compared at equal impact energy. Each variation was evaluated by its hammer efficiency, the fraction of the pile energy that entered the water and the depth-averaged sound exposure level (SEL) at 10 m from the pile axis. These quantities show whether a variation changes the noise through the energy delivered to the pile or through the fraction entering the water.
Doubling the ram length lowered the SEL by 4.9 dB at almost unchanged hammer efficiency. Shifting cross-sectional area from the impact end to the top of the ram lowered the SEL by 5.0 dB, although more energy entered the pile. The fraction of that energy that entered the water decreased by almost a factor of four. The doubled-length ram achieved a similar reduction to the MNRU model, without its loss of hammer efficiency but with twice the ram mass. The PULSE model gave a larger reduction, whose size depends on an uncalibrated chamber stiffness. Differences in underwater sound exposure were largely explained by the pile-head force spectrum. A more gradual force puts less of its spectrum where the pile radiates most strongly. The hammer design therefore changes the noise mainly through how gradually the pile-head force develops. The noise of a design is thus better assessed from its force spectrum than from its hammer efficiency. Future work should measure the differences between configurations and compare them at equal penetration per blow.
Estimating Ship Structural Response Using Sparse Sensor Measurements
Transient (Slamming) Effects
Stakeholder involvement is important in this process because stakeholders can provide knowledge, resources and access to the contexts in which innovations need to be implemented. At the same time, previous research shows that identifying, attracting and maintaining stakeholder involvement can be difficult. This thesis therefore investigates the challenges that projects themselves encounter when organising stakeholder involvement to support developments beyond the pilot.
The aim of this thesis is to understand how stakeholder involvement is organised in Dutch Living Labs and Field Labs and to identify the challenges that constrain stakeholder involvement in supporting scaling beyond the pilot. The central research question asks: What challenges do projects within Dutch Living Labs and Field Labs encounter when involving stakeholders to support scaling beyond the pilot?
A qualitative multiple-case study was conducted on three innovation projects in a Dutch Living Lab and Field Lab. Two cases took place at The Green Village in Delft and one case took place at Energie-Lab Zuid Oost in Amsterdam. Data were collected through project documentation, participant observations and 15 semi-structured interviews with actors from governmental institutions, Living and Field Labs, industry, and residents. The data were analysed using abductive thematic coding.
The findings show that stakeholder involvement was dynamic rather than continuous. Several challenges in involving stakeholders to support scaling beyond the pilot were identified within the case studies. These challenges occur on both sides of the involvement process, as both project teams and stakeholders face challenges that can limit involvement. 6 categories were identified: (1) limited resources and capacity; (2) identifying and reaching relevant stakeholders; (3) perceived relevance and willingness to participate; (4) meaningful participation and influence; (5) institutional and commercial constraints; and (6) project purpose and development stage.
The main implication is that deliberate choices need to be made within projects about the relevance of stakeholders at different stages, how they can realistically participate, and what opportunities they have to contribute. The study recommends more flexible approaches to involvement, explicit attention to representation and power, and participation methods that are adapted to stakeholder capacities and project needs. The main limitations are the retrospective design, the focus on three cases within two experimental environments, and the emphasis on actors who were already connected to the projects. Future research should therefore also investigate the perspectives of stakeholders who were not involved but could have been relevant and examine how meaningful stakeholder involvement can be organised under the practical and institutional constraints of real-world experimentation.
...
Stakeholder involvement is important in this process because stakeholders can provide knowledge, resources and access to the contexts in which innovations need to be implemented. At the same time, previous research shows that identifying, attracting and maintaining stakeholder involvement can be difficult. This thesis therefore investigates the challenges that projects themselves encounter when organising stakeholder involvement to support developments beyond the pilot.
The aim of this thesis is to understand how stakeholder involvement is organised in Dutch Living Labs and Field Labs and to identify the challenges that constrain stakeholder involvement in supporting scaling beyond the pilot. The central research question asks: What challenges do projects within Dutch Living Labs and Field Labs encounter when involving stakeholders to support scaling beyond the pilot?
A qualitative multiple-case study was conducted on three innovation projects in a Dutch Living Lab and Field Lab. Two cases took place at The Green Village in Delft and one case took place at Energie-Lab Zuid Oost in Amsterdam. Data were collected through project documentation, participant observations and 15 semi-structured interviews with actors from governmental institutions, Living and Field Labs, industry, and residents. The data were analysed using abductive thematic coding.
The findings show that stakeholder involvement was dynamic rather than continuous. Several challenges in involving stakeholders to support scaling beyond the pilot were identified within the case studies. These challenges occur on both sides of the involvement process, as both project teams and stakeholders face challenges that can limit involvement. 6 categories were identified: (1) limited resources and capacity; (2) identifying and reaching relevant stakeholders; (3) perceived relevance and willingness to participate; (4) meaningful participation and influence; (5) institutional and commercial constraints; and (6) project purpose and development stage.
The main implication is that deliberate choices need to be made within projects about the relevance of stakeholders at different stages, how they can realistically participate, and what opportunities they have to contribute. The study recommends more flexible approaches to involvement, explicit attention to representation and power, and participation methods that are adapted to stakeholder capacities and project needs. The main limitations are the retrospective design, the focus on three cases within two experimental environments, and the emphasis on actors who were already connected to the projects. Future research should therefore also investigate the perspectives of stakeholders who were not involved but could have been relevant and examine how meaningful stakeholder involvement can be organised under the practical and institutional constraints of real-world experimentation.
Lift Estimation from Wind Tunnel Wall Pressure
An experimental approach carried out at the Research & Development department of Econowind
A baseline experiment was conducted using a NACA0015 airfoil without suction. Lift coefficients obtained from WPM were compared with independently derived surface pressure measurements (SPM) at Reynolds numbers of Re=200,000, Re=400,000, and Re=600,000.
The results show good agreement between WPM and SPM in the pre-stall regime, while discrepancies increase around stall and become substantial in the post-stall region, where WPM consistently overpredicts lift relative to SPM.
Further analysis revealed that the measured wall-pressure footprint alone yields lift estimates close to those obtained from SPM in the post-stall regime, whereas the existing corrections and empirical extrapolations generally lead to overprediction.
These findings demonstrate the potential of WPM for lift estimation under predominantly attached-flow conditions while identifying strongly separated flow as a major limitation of the current approach. ...
A baseline experiment was conducted using a NACA0015 airfoil without suction. Lift coefficients obtained from WPM were compared with independently derived surface pressure measurements (SPM) at Reynolds numbers of Re=200,000, Re=400,000, and Re=600,000.
The results show good agreement between WPM and SPM in the pre-stall regime, while discrepancies increase around stall and become substantial in the post-stall region, where WPM consistently overpredicts lift relative to SPM.
Further analysis revealed that the measured wall-pressure footprint alone yields lift estimates close to those obtained from SPM in the post-stall regime, whereas the existing corrections and empirical extrapolations generally lead to overprediction.
These findings demonstrate the potential of WPM for lift estimation under predominantly attached-flow conditions while identifying strongly separated flow as a major limitation of the current approach.
Every extension improves the fit to the national data, yet none predicts the trip ends of unseen blocks of zones better than current practice when errors are counted in trips. The models with local coefficients are 5 to 7 percent worse in trips but more accurate in relative terms for small zones. A random split would have overstated accuracy by a factor of two. Robust tests reject a spatial lag; the remaining clustering is consistent with a regional level that BasGoed’s allocation builds into the data. Tour partners rarely coincide with geographic neighbours (8.7 percent), and industrial employment among them has a significant elasticity of about 0.09. In the regional model, all variants order busy and quiet roads correctly and differ far less from each other than from the counts.
The extensions add reach rather than accuracy. For base-year volumes the simplest model is as good as any; the tour model can show how growth in one place affects freight in places linked to it by tours. These findings hold within BasGoed’s simulated tours. ...
Every extension improves the fit to the national data, yet none predicts the trip ends of unseen blocks of zones better than current practice when errors are counted in trips. The models with local coefficients are 5 to 7 percent worse in trips but more accurate in relative terms for small zones. A random split would have overstated accuracy by a factor of two. Robust tests reject a spatial lag; the remaining clustering is consistent with a regional level that BasGoed’s allocation builds into the data. Tour partners rarely coincide with geographic neighbours (8.7 percent), and industrial employment among them has a significant elasticity of about 0.09. In the regional model, all variants order busy and quiet roads correctly and differ far less from each other than from the counts.
The extensions add reach rather than accuracy. For base-year volumes the simplest model is as good as any; the tour model can show how growth in one place affects freight in places linked to it by tours. These findings hold within BasGoed’s simulated tours.