Vasso Reppa
7 records found
1
Reduction of carbon emissions and greenhouse gases within the transportation sector is crucial due to its significant contribution to environmental degradation. To reduce this impact, it is important to develop and implement energy efficient systems. In addition to exploring rene
...
Currently, inland waterway shipping mainly includes barges and bulk transportation with little to no variation in volume, product, and route. Since transport over water emits less CO2 per tonne-km than road transport, a potential way to reduce CO2 emissions is to transport more c
...
The CCNR will ensure that in 2050 inland ships do not emit any emissions. A PEM fuel cell system running on pure hydrogen could be a solution. However, the new system imposes some difficulties on the design of the inland ship. A calculation model is created to evaluate inland shi
...
Nonholonomic mechanical systems encompass a large class of practically interesting robotic structures, such as wheeled mobile robots, space manipulators, and multi-fingered robot hands. However, few results exist on the cooperative control of such systems in a generic, distribute
...
In the present study, a Model Predictive Control (MPC) - based, Energy Management Strategy (EMS) is proposed, aiming at the minimisation of the fuel consumption of vessels with hybrid propulsion and power supply. This approach is capable of utilising online information regarding
...
Hull Generation for Fast Concept Exploration
Development of a Brute-Force Approach to Quickly Obtain Hull Shapes and a Resistance Prediction for Offshore Patrol Vessels
Damen Shipyards Gorinchem has found deficiencies in the process of developing concept designs of Offshore Patrol Vessels (OPVs). There is a need to increase the efficiency of this process, meaning that (1) the speed has to be increased, (2) the accuracy of designs has to be incre
...
How mature are your lead time estimations?
The proposal of a planning and estimation maturity framework for the maritime industry
During the start of a project organisations make estimation on the expected amount of work and the corresponding project duration, the lead time. To make these estimations with a low uncertainty is important because a false estimation could result in cost overruns and project del
...