HV

H. G. Voortman

2 records found

In the Lower Rhine river two hydro-power plants have been built at weirs. The third, most upstream weir at Driel was considered as well, but at the time (1988) could not be made feasible due to the low head difference at Driel. Developments in low-head hydro-power have given new ...
The nature of the Meuse River is more than any other major river in the Netherlands formed by the presence of weirs. These were constructed almost one century ago to enable transport of coal; nowadays, the boundary conditions have changed and will continue to change in the future ...