Wv
W.H.P. van Westering
11 records found
1
Linear simulation of large scale regional electricity distribution networks and its applications
Towards a controllable electricity network
The volatility of renewable energy sources pose a significant challenge for Distribution Network Operators (DNOs) as it makes planning and maintaining a reliable electricity grid more complex. An essential tool in dealing with the uncertain behavior of renewable energy resources
...
Low voltage power grid congestion reduction using a community battery
Design principles, control and experimental validation
By installing a battery storage system in the power grid, Distribution Network Operators (DNOs) can solve congestion problems caused by decentralized renewable generation. This paper provides the necessary theory to use such a community battery for grid congestion reduction, back
...
The energy transition poses a challenge for the electricity distribution network design as new energy technologies cause increasing and uncertain network loads. Traditional static load models cannot cope with the stochastic nature of this new technology adoption. Furthermore, tra
...
In this paper, we propose a fast linear power flow method using a constant impedance load model to simulate both the entire Low Voltage (LV) and Medium Voltage (MV) networks in a single simulation. Accuracy and efficiency of this linear approach are validated by comparing it with
...
Since the volatility of the power load is expected to keep increasing due to new energy technologies, modelling the stochastic properties of the power loads becomes increasingly important for distribution network operators. Due to limited measurements in these grids, often bottom
...
Modeling low voltage networks poses a challenge to Distribution System Operators (DSOs) because the low voltage networks generally consists of millions of cables. This paper provides a method to model congestion problems and applies this to such a large low voltage network. By mo
...
This paper applies the distribution network reconfiguration problem to existing networks. The medium voltage distribution network of the Dutch DSO Alliander is operated using a radial topology. By optimizing this topology it is possible to reduce the energy losses caused by the c
...
This paper assesses the power capacity overload problem caused by new energy techniques on a large portion of the Alliander power distribution grid. Over 15,000 km of power cables and 7,000 transformers have been evaluated as part of this study. Many data sources have been combin
...