Long-term material and structural behavior of high-strength concrete cantilever bridge
Results of 20 years monitoring
In 1997, the Second Stichtse Bridge was built in the Netherlands using the balanced cantilever method. The use of high-strength concrete was proposed. At that time, the long-term behaviour of this material was not known, and no code provisions were applicable. Therefore, it was p
...
In the Netherlands, approximately 150 prestressed T-beam bridges with cast-in-between decks and mainly built in the sixties are still in service. Upon assessment, the prestressed beams often do not fulfil the design codes requirements, whereas upon inspection, they show no signs
...
In 1997 the Second Stichtse Bridge, a high strength concrete box girder bridge was built in the Netherlands using the balanced cantilever method. At that time, the long-term behaviour of this material (with a cube compressive strength of 75 MPa) was not known. Therefore, it was p
...