Hub routing as an alternative to direct calls for third-party barge profiles

Master Thesis (2026)
Author(s)

N.L. Linssen (TU Delft - Civil Engineering & Geosciences)

Contributor(s)

S. Fazi – Mentor (TU Delft - Technology, Policy and Management)

E.B.H.J. van Hassel – Mentor (TU Delft - Mechanical Engineering)

Faculty
Civil Engineering & Geosciences
More Info
expand_more
Publication Year
2026
Language
English
Graduation Date
19-11-2026
Awarding Institution
Delft University of Technology
Project
TIL5060
Programme
Transport, Infrastructure and Logistics
Faculty
Civil Engineering & Geosciences
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Inland barges without a fixed window lose many hours in the queue at deepsea terminals. A consolidation hub with a shuttle service is often proposed as a remedy. This paper asks whether a third-party barge operator has a reason based on cost and time to use a hub that already runs and charges a real tariff. The direct call and the hub-and-spoke routings are modelled with discrete-event simulation (DES) for the shuttle service between the Maasvlakte and the Barge Center Waalhaven (BCW) in Rotterdam. Automatic Identification System (AIS) data of inland barges sets the inland-leg distributions and validates the direct call. Six operator profiles are formed by three vessel classes and two inland-leg profiles. The direct call is cheaper in all six profiles, by 63.85 to 84.07 EUR per twenty-foot equivalent unit (TEU). The shuttle fee of 67.50 EUR per TEU explains the largest part of this gap, while a barge without a fixed window pays nothing for its deepsea call. On time the hub wins only for the M8 class, by 2.29 to 2.68 hours per round trip. When the deepsea terminal is congested the hub becomes faster for the M6 class by up to 39.08 hours, but it stays more expensive by at least 30.23 EUR per TEU. The size of the operator fleet is the main lever for both time and cost.

Files

Thesis_MSC_Draft_V6_7_.pdf
(pdf | 4.26 Mb)
License info not available