Optimal sizing of renewable generation and storage for grid-connected CO2 electrolysis

a Dutch case study on syngas production for e-SAF

Journal Article (2026)
Author(s)

Thijmen Wiltink (TU Delft - Technology, Policy and Management)

Andrea Ramírez (TU Delft - Applied Sciences)

Mar Pérez-Fortes (TU Delft - Technology, Policy and Management)

Research Group
Energy and Industry
DOI related publication
https://doi.org/10.1039/d6gc04304f Final published version
More Info
expand_more
Publication Year
2026
Language
English
Research Group
Energy and Industry
Journal title
Green Chemistry
Issue number
35
Volume number
28
Pages (from-to)
14278-14296
Page Views
59
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Co-electrolysis of CO2 (CO2E) and water enables the production of syngas for sustainable aviation fuels (SAF) that are compliant with European RFNBO (renewable fuels of non-biological origin) regulations. However, a mismatch exists between the intermittent renewable electricity supply and the continuous operation of the downstream Fischer–Tropsch plants. To address this, we developed a two-stage linear optimization model to optimize the operation of a 540 MW electrolysis plant, alongside the sizing and operation of the connected renewable generation, battery storage, and syngas storage. Applying this model to a Dutch case study, we explored grid integration with an electrolyzer across future scenarios with global warming potentials (GWPs) ranging between 35 and 370 g CO2-eq per kWh. For generation, the preferred renewable mix is onshore wind combined with PV. When grid mix electricity consumption is restricted, the electrolyzer has an optimal capacity factor of 78% but requires a battery of comparable capacity to the electrolyzer and multi-kilotonne syngas storage to ensure continuous output. Crucially, we found that producing RFNBO-compliant syngas for SAF is impossible with the 2025 Dutch grid mix. Even at a reduced grid intensity of 205 g CO2-eq per kWh, RFNBO compliance limits grid consumption to just 1% of grid mix electricity per hour. This results in a levelized cost of 2350 EUR2019 per tonne syngas. Unrestricted grid electricity consumption becomes feasible when emissions drop below 36 g CO2-eq per kWh, reducing production costs by 43% (1344 EUR2019 per tonne syngas). Consequently, we demonstrate that grid composition intensity is a bottleneck for the short-term economic viability and regulatory compliance of CO2E-based SAF in the Netherlands.