The cost of grid stability in developing power systems

Evidence from Kenya

Journal Article (2026)
Author(s)

Cynthia Omondi (Kenyatta University)

Francis Njoka (Kenyatta University)

Francesco Tonini (Politecnico di Milano)

Edo Abraham (TU Delft - Civil Engineering & Geosciences)

Research Group
Water Systems Engineering
DOI related publication
https://doi.org/10.1016/j.esr.2026.102390 Final published version
More Info
expand_more
Publication Year
2026
Language
English
Research Group
Water Systems Engineering
Journal title
Energy Strategy Reviews
Volume number
68
Article number
102390
Page Views
23
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Many developing economies must expand electricity access and improve power system reliability simultaneously, often under constrained investment. This dual objective requires examining the costs of achieving a stable electric grid and prioritising investment opportunities across generation, storage, and demand-side management—an area largely underexplored in energy planning in developing economies. This paper identifies alternatives that balance cost and voltage-based stability over the 2030-2050 planning period by integrating long-term generation expansion, energy storage deployment, and demand response flexibility, tailored to the specific characteristics of Kenya's power system. The findings reveal a set of Pareto-optimal solutions, highlighting significant potential for cost reductions and grid stabilisation through load shifting practices. The analysis indicates that optimal generation capacity expansion tends to happen more consistently over shorter time frames, with the average time being every 0.62 years (maximum of 3.8 years), while storage capacity expansion is more favourable over medium-to long-term durations, with an average of every 3.17 years (maximum of 8.7 years). The mean optimal net present costs from 10 independent runs are approximately 19.27 billion USD, ranging from 13.25 to 24.93 billion USD across the planning period. The findings underscore the need for targeted investments in energy storage infrastructure to compensate for variability, as well as stronger institutional capacity to coordinate critical infrastructure development, pricing mechanisms, and consumer engagement programs.