A future-proof Infrastructure Connection for Cemare

A Multidisciplinary Approach to Bridge Design and Stakeholder Engagement

Student Report (2026)
Author(s)

R.W. Brandsma (TU Delft - Technology, Policy and Management)

E.D. Schat (TU Delft - Technology, Policy and Management)

B.G.J. Stassen (TU Delft - Civil Engineering & Geosciences)

J.T. Joosten (TU Delft - Industrial Design Engineering)

L.I. van Dun (TU Delft - Technology, Policy and Management)

Contributor(s)

José A. Á. Antolínez – Mentor (TU Delft - Civil Engineering & Geosciences)

J.A. Annema – Mentor (TU Delft - Technology, Policy and Management)

S. Hiemstra-van Mastrigt – Mentor (TU Delft - Industrial Design Engineering)

D. Wüthrich – Mentor (TU Delft - Civil Engineering & Geosciences)

Faculty
Civil Engineering & Geosciences
More Info
expand_more
Publication Year
2026
Language
English
Graduation Date
09-11-2026
Awarding Institution
Delft University of Technology
Project
CEGM3000 Multidisciplinary Project
Programme
Civil Engineering
Sponsors
None
Faculty
Civil Engineering & Geosciences
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

The Cemare Bridge is the only car-accessible connection between Cemare Village and mainland Lombok, providing access to essential services such as healthcare. However, its deteriorating condition threatens safe access, and the planned renovation is expected to extend its lifespan by only a few years. This research aimed to enable the Indonesia Biru Foundation (IBF) to support the development of a desirable, feasible and viable infrastructure connection with a long-term functional lifespan.

The multidisciplinary research consisted of three phases: Analysis, Design and Communication. The Analysis phase combined actor analysis, a survey (n = 47), interviews, participatory design, traffic counting, structural assessment and a literature study. The actor analysis identified the West Lombok regency as the main decision-making authority, while IBF's role is primarily to facilitate stakeholder involvement. It also revealed the absence of long-term arrangements for bridge inspection, maintenance and funding.

In the Design phase, three conceptual designs were developed using function analysis, a morphological chart and role-play, and evaluated through multi-criteria analysis (MCA). The R2 Dependency concept received the highest score (0.875), mainly due to its strong performance on accessibility, reliability and structural durability. The proposed concrete bridge separates pedestrians from vehicles and incorporates a Park and Ride facility. The local community would carry out routine maintenance, while the regency would remain responsible for major structural upkeep.

During the Communication phase, the findings were translated into Project Jembatan, a series of visual posters in Bahasa Indonesia explaining the design process, proposed solutions and maintenance arrangements to local stakeholders. The research enables IBF to support infrastructure development by connecting community needs, technical design and institutional responsibilities. The next step is for IBF to further discuss the proposed design with the regency to explore alignment with existing plans. Further technical assessments, cost estimates and formal funding arrangements are required before implementation.